Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (November 2001, week 4)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Fri, 23 Nov 2001 15:54:34 -0500
Reply-To:     Larry Chase <lchase@ATTGLOBAL.NET>
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         Larry Chase <lchase@ATTGLOBAL.NET>
Subject:      Re: Newbie >>>> Intro .. sorry ... LONG

On Thu, 22 Nov 2001 20:12:53 -0500, Data Services <dataservices@MEDIAONE.NET> wrote:

>I took the inside out of mine to check/repair any defects, installed Q- pads to quiet things, put in new pink fiberglass insulation (not to thick), and vapor sealed the thing with heavy mil plastic (what a pita around the utility ports). I decided on a Tiico replacement (a new engine), to take care of waterboxer problems for the next 2 to 3 K miles . Add some or all of these to your list and > >Happy Motoring!!! > >Dave >83 Tiico Westy >83 WBX Westy >59 SO4 Westy (Mostly) > ----- Original Message ----- > From: Larry C Chase > To: vanagon@GERRY.VANAGON.COM > Sent: Tuesday, November 20, 2001 2:27 PM > Subject: Newbie >>>> Intro .. sorry ... LONG > > > Vanagon List Members, > > I delighted to announce that I have completed my self > imposed Newbie initiation. > > 1. Scour the Archives for all areas of interest and info > .... minimum 2 mnths. > 2. Lurk quietly & Humbly in the background and absorb > as much of the huge volume of incredible and knowledgeable > dialog for at least 2 months > 3. Test the waters by slipping a toe the knowledge pool > by submitting a couple of non-controversial questions > about source etc to knowledgeable members off line. > 4. Finally ... the coming out (sort of) by submitting a > humble introductory note. > > Background: > > Vehicle - 85 Westy GL (as yet unnamed, had a few > ideas, but you guys beat me to it) > Geo - Bay Area, Campbell CA > > Comments: > > Purchased my Westy (Salvage Title) approx 3 months ago > in Sacramento - Full Camper, Exc Condition, Low Miles, > Fresh Parts, Brown w/beige interior, 4-speed, AC, miles (105K) > > Second VW but first Van. Had a 69 Beetle in the early 70's. > > Mechanically incompetent ... or close to it. > > Reason for purchase ..... ~ July 2002 I plan to gently slide > behind the wheel of my properly prepared 85 Westy and > drive the four points of the compass for many, many miles. > North when it's hot, south when it's cold etc. Duration only > limited by desire. Might be a month, might be a year, might > keep orbiting like one of those Satellites. > > Thus the Westy will be home. > > Found a good local mechanic and told him ..... we need to > go thru it top to bottom and repair/replace anything that might > fail within 50,000 of continuous driving. Looked at me weird, > then I saw these dollar sign kinda of sparkles in his eyes, he > began hyperventilating. After I paper bagged him and he > calmed down we talked about a long term relationship and > fair honest treatment ........ Have always been leery of > commitment so at this point I began hyperventilating. > > We then put a plan together to space out what was needed > ... chunk it down if you will over the nxt several mnths. > > Overall plan: > > 1. Mechanical repairs - Ongoing > a. Front end > b. Misc odds & ends > c. Rebuild Transaxle etc > d. Check and Rebuild trans (4 sp) if needed > e. Rebuild 1.9 Waterboxer > 2. New Tires & Shocks - Bridgestone LT Reinforced > sidewall & KYB Gas Shocks - DONE > 3. Rubber, as in hoses replacement - to be done > 4. Awning / Shady Boy (Installed by GoWesty) - DONE > 5. Roof rack for very light weight Kayak .... don't scold me . > .. I know the load limit and stress factors - DONE > 6. Rear bike rack ..... Gary Lee's wonderful creation - Done > 7. Replace all interior carpet - On Order from GoWesty - in process > 8. Replace Skylight - GoWesty - Done > 9. Add more interior lighting - Parts received most frm West > Marine / Need to install > 10. Add 2 interior fans - see lighting above > 11. Redo do electrical system, inverter/converter ... extra outlets, > Deep Cycle Ax Battery etc. - to be done > 12. Add Vented Furnace (still researching ... short list is Suburban, > Espar B1LC, Carver) - to be done > 13. New 3 window poptop & Install - GoWesty DONE > 14. Purchase Honda 1000 watt generator (lots of dry camping) > - to be done > 15. Purchase & Install Black Metal bumpers (rear on order, > still need front) - to be done > 16. Upgrade/rebuild/improve AC .. recent thread on topic > was very helpful - to be done > 17. Install sound system that integrates Laptop (MP3), Indash > CD/FM/AM, Sat TV - to be done > 18. Purchase & Install RV Satellite TV System (wish internet > version was ready for RV market) - to be done > 19. Purchase & Install all exterior door locks & rekey to same > (BusDepot & Steve Sandlin) - in process > 20. Purchase and install all exterior window/door rubber - to be done > 21. Replace almost all exterior lighting lenses - Ongoing > 22. Purchase & Install 4 headlight grill (South African etc) - to be done > 23. Repaint exterior / Original VW Brown color - to be done > 24. Purchase & Install all exterior decals - to be done > 25. Everything else I forget or don't know yet - to be done > > Any comments, suggestions, sources, feedback etc are > more than welcome. > > Please forgive the length of this message. This will be my > one time overly long dialog for 2001. > > Humbly, > > Larry Chase >

Dave,

Thanks for the great suggestions.

One clarification ... what are "Q-Pads"?


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.