Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (April 2003, week 3)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Fri, 18 Apr 2003 21:06:25 -0700
Reply-To:     pensioner <al_knoll@PACBELL.NET>
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         pensioner <al_knoll@PACBELL.NET>
Subject:      Re: La Madeleine - the largest Westfalia campout in North America
In-Reply-To:  <200304160149.h3G1nmFJ005427@mtac2.prodigy.net>
Content-Type: text/plain; charset="iso-8859-1"

FWIW how to get there from Sacramento CA....or 2300 Miles on I80 for fun and excitement...

p

Time Mile Instruction For Summary: 3672.8 miles (7 days, 3 hours, 32 minutes) DAY 1 9:00 AM 0.0 Depart Sacramento on 10th St (North) 0.5 mi 9:01 AM 0.5 Turn RIGHT (East) onto J St 1.5 mi 9:05 AM 2.0 Turn LEFT (North) onto Ramp 0.2 mi 9:07 AM 2.3 Merge onto I-80 Bus [Capital City Fwy] (North) 7.4 mi 9:16 AM 9.7 Continue (East) on I-80 496.2 mi Construction between Truckee and Floriston from 04/08/02 to 05/30/03 11:00 AM 119.2 Entering Nevada 5:00 PM 505.9 End of day DAY 2 9:00 AM 505.9 Stay on I-80 [US-93] 143.3 mi 9:22 AM 530.1 Entering Utah 11:13 AM 649.2 Turn off onto Ramp 1.0 mi 11:15 AM 650.2 At I-15 Exit 310, merge onto I-15 [I-80] (South) 2.3 mi 11:18 AM 652.4 Turn off onto Ramp 0.6 mi 11:19 AM 653.0 Merge onto I-80 (East) 366.6 mi 12:30 PM 727.1 Entering Wyoming Resurfacing between Hanna and Arlington from 07/01/02 to 08/29/03 5:00 PM 1019.6 End of day DAY 3 9:00 AM 1019.6 Stay on I-80 520.0 mi 10:42 AM 1130.1 Entering Nebraska Construction in Big Springs from 08/12/02 to 06/30/03 5:00 PM 1539.6 End of day DAY 4 9:00 AM 1539.6 Stay on I-80 46.2 mi 9:44 AM 1584.9 Entering Iowa 9:46 AM 1585.8 At I-80 Exit 1A/I-29 I-80 Exit, continue (East) on I-29 [I-80] 3.0 mi 9:49 AM 1588.8 At I-29 Exit 4/I-80 I-29 Exit, bear LEFT (East) onto I-80 119.2 mi Resurfacing near Dexter from 05/10/02 to 05/30/03 11:39 AM 1708.0 At I-80 Exit 123/I-35 I-80 Exit, continue (East) on I-235 13.8 mi Bridge work in Des Moines from 09/23/02 to 11/28/03 11:53 AM 1721.8 At I-80 Exit 138/I-35 I-80 Exit, bear RIGHT (East) onto I-80 323.6 mi Interchange Reconstruction in Davenport from 09/13/02 to 03/31/03 2:28 PM 1890.5 Entering Illinois 4:53 PM 2045.4 At I-80 Exit 155, turn off onto Ramp 0.3 mi 4:54 PM 2045.6 *Tollbooth* Stay on Ramp (East) 0.3 mi 4:55 PM 2045.9 *Toll road* Merge onto I-80 [I-294] (East) 4.8 mi 5:00 PM 2050.7 End of day DAY 5 9:00 AM 2050.7 *Toll road* Stay on I-80 [I-294] (East) 0.1 mi 9:00 AM 2050.8 At I-80 Exit 160B, stay on I-80 [I-294] (East) 18.2 mi 9:03 AM 2053.7 Entering Indiana Interchange Reconstruction between Hammond and Gary (EB) from 07/05/02 to 05/30/03 9:19 AM 2069.0 At I-80 Exit 16, turn off onto Ramp 1.0 mi 9:21 AM 2070.0 *Toll road* Merge onto I-80 [I-90] (East) 278.6 mi 11:26 AM 2205.9 Entering Ohio 1:40 PM 2348.6 At I-80 Exit 8A, bear LEFT (North) onto I-90 27.4 mi 2:08 PM 2376.0 At I-90 Exit 170B, turn off onto Ramp 0.5 mi 2:10 PM 2376.5 Merge onto I-90 (East) 17.4 mi 2:32 PM 2393.9 Turn off onto Ramp 0.7 mi 2:33 PM 2394.6 Merge onto I-90 (East) 101.4 mi Construction between Kingsville and Conneaut from 05/03/02 to 07/30/03 3:24 PM 2449.6 Entering Pennsylvania 4:07 PM 2495.9 Entering New York 4:07 PM 2495.9 *Toll road* Stay on I-90 [New York State Thwy] (North-East) 57.2 mi 5:00 PM 2553.1 End of day DAY 6 9:00 AM 2553.1 *Toll road* Stay on I-90 [New York State Thwy] (East) 8.3 mi 9:07 AM 2561.4 *Tollbooth* Stay on I-90 [New York State Thwy] (East) 0.3 mi 9:08 AM 2561.7 At I-90 Exit 55, stay on I-90 [New York State Thwy] (East) 10.2 mi 9:20 AM 2571.8 *Toll road* Stay on I-90 [New York State Thwy] (East) 0.4 mi 9:21 AM 2572.2 *Toll road* *Tollbooth* Stay on I-90 [New York State Thwy] (East) 1.0 mi 9:22 AM 2573.2 *Toll road* Stay on I-90 [New York State Thwy] (East) 270.5 mi 1:33 PM 2843.7 At I-87 Exit 24, stay on I-90 [I-87] (South-East) 20.5 mi Bridge work in Albany from 06/10/02 to 03/28/03 1:53 PM 2864.2 *Toll road* At I-90 Exit B1, stay on I-90 [Berkshire Ext] (East) 108.2 mi 2:10 PM 2881.9 Entering Massachusetts 3:36 PM 2972.4 At I-90 Exit 7, bear LEFT (North) onto I-290 19.7 mi 3:56 PM 2992.1 At I-290 Exit 26/I-495 Exit 25, turn LEFT (North) onto I-495 55.8 mi 4:52 PM 3047.9 At I-95 Exit 54/I-495 I-95 Exit, bear RIGHT (North) onto I-95 2.3 mi 4:53 PM 3049.2 Entering New Hampshire 4:54 PM 3050.1 *Toll road* At I-95 Exit 1, stay on I-95 [New Hampshire Tpke] (North) 6.1 mi 5:00 PM 3056.2 End of day DAY 7 9:00 AM 3056.2 *Toll road* Stay on I-95 [New Hampshire Tpke] 5.5 mi 9:05 AM 3061.7 Stay on I-95 [New Hampshire Tpke] (North-East) 10.4 mi 9:08 AM 3065.4 Entering Maine 9:15 AM 3072.2 *Toll road* At I-95 Exit 1, stay on I-95 [Maine Tpke] (East) 47.9 mi 9:59 AM 3120.1 At I-95 Exit 15, stay on I-95 [I-295] (North-East) 41.1 mi 10:37 AM 3161.2 *Toll road* At I-95 Exit 14, stay on I-95 (North) 2.1 mi 10:39 AM 3163.4 Stay on I-95 (North) 109 yds 10:39 AM 3163.4 *Toll road* Stay on I-95 (North) 2.1 mi 10:41 AM 3165.5 Stay on I-95 (North) 164 yds 10:41 AM 3165.6 *Toll road* Stay on I-95 (North) 1.4 mi 10:42 AM 3167.0 Stay on I-95 (North) 142 yds 10:42 AM 3167.1 *Toll road* Stay on I-95 (North) 0.8 mi 10:43 AM 3167.9 Stay on I-95 (North) 73.3 mi 11:51 AM 3241.1 At I-95 Exit 45, bear RIGHT (East) onto I-395 1.5 mi 11:53 AM 3242.6 At I-395 Exit 3, turn LEFT (North) onto SR-9 [US-1] 89.4 mi 1:42 PM 3332.0 Bear RIGHT (East) onto US-1 6.9 mi 1:51 PM 3338.9 Turn LEFT (West) onto Main St 0.4 mi 1:53 PM 3339.3 Entering New Brunswick 1:53 PM 3339.3 Continue (North) on Local road(s) 131 yds 1:53 PM 3339.4 Bear RIGHT (East) onto HWY-3 1.2 mi 1:56 PM 3340.6 Continue (North) on HWY-1 111.0 mi 4:05 PM 3451.6 Bear RIGHT (North-East) onto TC-2 23.1 mi 4:31 PM 3474.7 Continue (North-East) on HWY-2 10.3 mi 4:44 PM 3485.0 Bear RIGHT (East) onto TC-2 12.9 mi 5:00 PM 3497.9 End of day DAY 8 9:00 AM 3497.9 Stay on TC-2 10.2 mi 9:12 AM 3508.0 Bear LEFT (North-East) onto HWY-15 31.3 mi 9:48 AM 3539.3 Bear LEFT (North-East) onto HWY-955 19.6 mi 10:12 AM 3559.0 Turn LEFT (North) onto TC-1 14.0 mi 10:18 AM 3564.1 Entering Prince Edward Island 10:29 AM 3572.9 Turn LEFT (North) onto HWY-1A 11.5 mi 10:44 AM 3584.4 Turn LEFT (South-West) onto HWY-11 8.1 mi 10:54 AM 3592.5 Turn RIGHT (North) onto HWY-12 0.9 mi 10:56 AM 3593.4 Turn LEFT (West) onto HWY-2 26.0 mi 11:27 AM 3619.4 Bear LEFT (West) onto HWY-14 52.9 mi 12:31 PM 3672.3 Turn RIGHT (South) onto Local road(s) 0.5 mi 12:32 PM 3672.8 Arrive Seacow Pond

SUMMARY Driving distance: 3672.8 miles Total travel time: 7 days, 3 hours, 32 minutes Driving time: 59 hours, 32 minutes Cost: $187.92


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.