Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (May 2004, week 2)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Fri, 14 May 2004 11:21:50 EDT
Reply-To:     THX0001@AOL.COM
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         George Goff <THX0001@AOL.COM>
Subject:      Re: Used Shifter out there?
Content-Type: text/plain; charset="US-ASCII"

In a message dated 5/14/04 6:51:51 AM, RAlanen@AOL.COM writes:

<< weld up the old one with the brace inside. >>

Welding will anneal the metal unless the welding is followed by heat treating. If allowed to cool naturally, welding high carbon steel is like cooking spaghetti. The biggest problem in welding something like this is identifying the grade of steel so that the proper procedures can be applied. Get a new shifter rod or fabricate, harden and temper one.

George


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.