Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (September 2005, week 1)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Tue, 6 Sep 2005 07:57:11 -0400
Reply-To:     Michael Edwards <medwards1@TRIAD.RR.COM>
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         Michael Edwards <medwards1@TRIAD.RR.COM>
Subject:      Standard Repair Times - Rings / Heads
Content-Type: text/plain; format=flowed; charset="iso-8859-1";
              reply-type=original

I just got some quotes from my local mechanic and wanted to run them by the list for some feedback. He looked up repair times on the computer, not sure of the source, but I know it is a common practice for mechanics to look up common tasks for quotes. Anyway, he had to pull the heads to fix a corrosion and leak problem. This job came in at 10 hours. Apparently, removing the heads required removing the engine. I also need a new set of rings and he said this requires splitting the case, a 7.4 hour job. Obviously, now is a better time to replace the rings so I don't loose the labor already invested in pulling the engine and heads. However, I thought changing the rings could just be done by removing the cylinders. Does this sound right? Do you really have to split the case to change the rings? Also, why is it necessary to remove the engine to remove the heads? I guess I should go ahead and put in a clutch while the engine is out. Anything else? Any feedback or references to information sources appreciated. Thanks, Mike


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.