Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (September 2005, week 1)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Tue, 6 Sep 2005 22:02:01 -0400
Reply-To:     Michael Edwards <medwards1@TRIAD.RR.COM>
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         Michael Edwards <medwards1@TRIAD.RR.COM>
Subject:      Standard Repair Times - Rings / Heads
Comments: cc: rrecardo@WEBTV.NET, dhaynes@OPTONLINE.NET, inua@CHARTER.NET
Content-Type: text/plain; format=flowed; charset="iso-8859-1";
              reply-type=original

Thanks to all who responded. Sorry I forgot to mention it is an 87 2.1L with 82k. The reason I'm looking at new rings is because I get smoke at start up after it has been sitting for a while and have noticed some oil consumption without a leak. My thought was, "well the heads are already off, shouldn't take too long to throw on a set of rings". That's why I was so shocked when he mentioned having to split the case. I'm new to my 2.1 but have torn down enough Type 1 engines to know that sounds funny. Sounds like the consensus is: The engine doesn't have to be removed to do the head seals. The cases don't have to be split to do the rings. Given John's response and the relatively low mileage I'll probably forgo the bottom end rebuild and try to get out of this without too much more money. Seems if you go to far the economies of scale start to kick in and its cheaper just to exchange for a full rebuilt engine.


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.