Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (August 2006, week 4)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Sat, 26 Aug 2006 18:19:00 -0700
Reply-To:     Mark Drillock <mdrillock@COX.NET>
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         Mark Drillock <mdrillock@COX.NET>
Subject:      Re: Yet another turn signal L.E.D. data point...
Comments: To: Jim Felder <felder@KNOLOGY.NET>
In-Reply-To:  <03A1B83C-DE2D-45E0-9807-7A29189884E0@KNOLOGY.NET>
Content-Type: text/plain; charset=us-ascii; format=flowed

Yes, the edge connector at the passenger end of the cluster is the 14 pin connector.

Bentley 90.8 shows the early 14 pin wire order. Page 90.18 shows the later pin order.

The early order covers up through 84, but a few 84s have the later wiring, namely Wolfsburg models with early tachs(no green zone).

Mark

Jim Felder wrote:

> Thanks as always, Mark. And the plumbing analogy was nice, reading my > email on my PowerBook at the table over Chili--not!... just messing > with you. > > Plumbing and the things that go with it, these are the lessons in life > I understand. > > I've left everything sitting out where I was working on it, it's about > to get dark. Is that IC connector you're referring to the main one into > the clock(tach, whatever) end of the cluster? > > Thanks again, > > Jim >


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.