I could care less about speed.. I am interested in quality. when I do a dash or heater box..there are nearly endless little tweaks.. adjusting things, lubing things, addressing corrosion, improving things ..gluing weather stripping back on etc. Speed itself isn't worth jack unless it's an emergency, IMO. I have spent countless hours re-doing poorly done work on Vanagons. I almost specialize in it, or did. Scott
On 12/6/2013 5:35 AM, David Bjorkman wrote: > Wow Jim, that's pretty quick. Reminds me of the times (way back) at > Small Wheels shop when we used to compete to find how fast we could > pull a bug motor, drag it 30 feet out and back, and reinstall it. > Dave B. > On 12/05/13, Jim Felder<jim.felder@GMAIL.COM> wrote: > > I can do a dash out, bust open box, replace > heater blower, seal box and reinstall dash in four hours. > > Thanks, > > Jim > > > |
Please note - During the past 17 years of operation, several gigabytes of
Vanagon mail messages have been archived. Searching the entire collection
will take up to five minutes to complete. Please be patient!
Return to the archives @ gerry.vanagon.com
The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.
Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.