Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (February 2014, week 2)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Sun, 9 Feb 2014 15:36:12 -0500
Reply-To:     Jim Akiba <syncrolist@BOSTIG.COM>
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         Jim Akiba <syncrolist@BOSTIG.COM>
Subject:      Re: Exhaust Bushing Inner Weave Premature Failure
Comments: To: Neil N <musomuso@gmail.com>
In-Reply-To:  <CAB2Rwfi6gA2Zn2DG3_bx79TY=MueRECpbhxBV4ZD5Reozd5-rg@mail.gmail.com>
Content-Type: text/plain; charset=ISO-8859-1

Hey Neil,

What material are the primaries? Also the way they are welded is sub-optimal which isn't helping. For tubes in flanges, it's best to fully weld the face/tube opposite the side of entry into the flange, then place 3 or 4 longish tacks on the entry side. This helps strengthen the joint while offering more support to the tube by using the thickness of the flange itself and not overheating the primaries where they are weakest. In addition, if you have preloaded the primaries at all they are going to crack... in addition, depending on what material/thickness it is they may also stress corrosion crack in the HAZ of the weld. With hotter temps cracking can be minimized with thicker materials and better fillers as well as less heat. If you had the tubes welded as I describe above, you'd have a smaller HAZ where you see those cracks because the flange will protect the tube and sink much of the heat from the welding.

Jim Akiba

On Sun, Feb 9, 2014 at 2:33 PM, Neil N <musomuso@gmail.com> wrote: > And to further explain so others don't think I'm totally nuts ..... ha ha > > One of the big hurdles for me as a total newb to engine conversions > was getting any kind of exhaust up and running even just for short > test runs; I knew enough then to know that the joint between downpipe > and flange at manifold needed to be 100% good. With a "factory" made > downpipe, one might stand a better chance of at least cobbling > together an exhaust to allow a trip to the local exhaust shop. > > The first welds to fail were at the joint from exhaust downpipe flange > to downpipe. Ironically, these were done by a pro fabrication shop. > BUT.... these happened after these cracks showed started. Image of V > 1.0 cracks near pro welds: http://tinyurl.com/la6kgzh It was > obvious that the issue wasn't the weld quality but my design and work. > > On 2/9/14, Neil N <musomuso@gmail.com> wrote: > >> My goal, in part, was to help others; I wanted to use OEM downpipe >> bushing. > -- > Neil n > > Blog: tubaneil.blogspot.ca > > '88 Westy http://tinyurl.com/c8rlw6p > > '81 VanaJetta 2.0 "Jaco" http://tubaneil.googlepages.com/ > > Vanagon VAG *Gas* inline-VR Engine Swap Group: > > http://tinyurl.com/d7gd5ej


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.