Dennis: ASME tanks are to be periodically inspected and re-qualified. It's been so long, I cannot recall the intervals - and they likely have change - but I did confirm that - in this country anyway - they are to be inspected.
On 06-Oct-2015, at 18:46, Dennis Haynes wrote: > Once the tank is filed with any amount of "liquid" propane the pressure is > dependent on temperature. On a hot day with road heat sinking into the tank > you can get 200 psi in there. > > http://docs.engineeringtoolbox.com/documents/1020/propane_C3H8_vapour_pressu > re.pdf > > The tank is an AME rated tank, not DOT. The inspections/testing for the DOT > tanks are not required. > > Dennis > |
Please note - During the past 17 years of operation, several gigabytes of
Vanagon mail messages have been archived. Searching the entire collection
will take up to five minutes to complete. Please be patient!
Return to the archives @ gerry.vanagon.com
The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.
Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.