I've got two projects going at once, and it has moved awfully slow, but at last there are happenings! All documents from city and county before construction are in place now, subcontractors a arranged. I need to open two checking accounts for dealing with labor and materials, which will be done Monday. After that materials can be ordered and work begin. On the EJ25 conversion for my '88 GL Tintop I have acquired upgraded head gaskets (felpro), new ring set, and a set of two special wrenches for the cam sprocket and crank dampener. I learned long ago in the aircraft mechanic trades to have the right tool for the job, always. Should begin dismantling it next week. |
Please note - During the past 17 years of operation, several gigabytes of
Vanagon mail messages have been archived. Searching the entire collection
will take up to five minutes to complete. Please be patient!
Return to the archives @ gerry.vanagon.com
The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.
Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.