Vanagon EuroVan
Previous messageNext messagePrevious in topicNext in topicPrevious by same authorNext by same authorPrevious page (January 2000, week 2)Back to main VANAGON pageJoin or leave VANAGON (or change settings)ReplyPost a new messageSearchProportional fontNon-proportional font
Date:         Tue, 11 Jan 2000 13:10:33 -0000
Reply-To:     Phil Marston <pmarston@INSTECH.CO.UK>
Sender:       Vanagon Mailing List <vanagon@gerry.vanagon.com>
From:         Phil Marston <pmarston@INSTECH.CO.UK>
Subject:      Hydraulic lifter valve clearance settings on a 1600 aircooled
Content-Type: multipart/alternative;

Please excuse me raising this subject again but there has been so much too-ing & fro-ing that I just wanted to summarise what had been said in my own mind that I can actually go ahead and put it into practise this weekend. When I recently re-built my engine I followed the Haynes manual when adjusting the tappets and pre-loaded the hydraulic tappets by getting to the point where the assembly took up all of the slack and then added a couple of extra turns. It now appears that general concensus is that I should have in fact made not pre-loaded but instead backed off slightly & set a gap of about .006". (This is with a cold engine that has been standing overnight). Is this correct or have I mis-understood ?

I have not checked the compression yet with my present settings but the lack of power and ease of turning over the engine indicates that something is not quite right. What compression should I be after with a new set of pistons, barrels & heads ?

Thanks in advance Phil 81 Type 25


[text/html]


Back to: Top of message | Previous page | Main VANAGON page

Please note - During the past 17 years of operation, several gigabytes of Vanagon mail messages have been archived. Searching the entire collection will take up to five minutes to complete. Please be patient!


Return to the archives @ gerry.vanagon.com


The vanagon mailing list archives are copyright (c) 1994-2011, and may not be reproduced without the express written permission of the list administrators. Posting messages to this mailing list grants a license to the mailing list administrators to reproduce the message in a compilation, either printed or electronic. All compilations will be not-for-profit, with any excess proceeds going to the Vanagon mailing list.

Any profits from list compilations go exclusively towards the management and operation of the Vanagon mailing list and vanagon mailing list web site.